Final Report

Executive Summary

An executive Summary of the result of the research.

Full Final Report

The Final Report includes analysis of Combined Heating and Power system for a hotel along with a greywater reheat system.

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, pleae be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Geoffrey Kim. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differeng assumptions, code reference, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.